HMI - FactoryClient

Hardware setup

1. Site Prerequisites

  • Power: Ensure a standard 100–240VAC (50–60Hz) power outlet is available near the installation site to support the external 30W universal power adapter brick.

  • Network: Run a dedicated RJ45 copper network cable connected to a local Gigabit network switch (1 Gbps capability). There is no wifi support at the time.

  • Mounting Interface: Verify your mounting apparatus if you need Vesa (wall mount, articulating arm, or proprietary stand) utilizes a standard VESA FDMI-compliant four-hole pattern with M4 screws in a 100x100 mm pattern.

2. Unboxing & Inspection

  • Carefully unpack the kit and verify the presence of the FactoryClient unit, the 30W power adapter brick, regional power cords, and mounting fasteners.

3. Mounting the Terminal

  • Lay the monitor face down on a clean, flat, and protected surface.

  • Align your VESA-compliant mount or stand with the rear holes of the monitor frame and secure it tightly using the provided M4 fasteners.

  • Or mount on Wall or DIN rail

4. Cable Integration

  • Connect your display

  • Connect your keyboard (necessary at least for 1st initialization)

  • Connect the local RJ45 network cable into the monitor's dedicated NIC port.

  • Connect the power brick

5. Initial Power On

  • Locate the physical Power Button and toggle it to boot the unit.

  • Verify that the system status indicator light transitions to a solid green color

Last updated: