HMI Solutions - FactoryTouch

Hardware setup

1. Site Prerequisites

  • Power: Ensure a standard 100–240VAC (50–60Hz) power outlet is available near the installation site to support the external 180W universal power adapter brick.

  • Network: Run a dedicated RJ45 copper network cable connected to a local Gigabit network switch (1 Gbps capability).

  • Mounting Interface: Verify your mounting apparatus (wall mount, articulating arm, or proprietary stand) utilizes a standard VESA FDMI-compliant four-hole pattern with M4 screws in a 100x100 mm pattern.

2. Unboxing & Inspection

  • Carefully unpack the kit and verify the presence of the FactoryTouch unit, the 180W power adapter brick, regional power cords, and VESA mounting fasteners.

  • Inspect the pre-attached hardware extensions, ensuring the right-side NFC reader and bottom 2D Barcode scanner are secure and undamaged.

3. Mounting the Terminal

  • Lay the monitor face down on a clean, flat, and protected surface.

  • Align your VESA-compliant mount or stand with the rear holes of the monitor frame and secure it tightly using the provided M4 fasteners.

4. Cable Integration

  • Unscrew and remove the rear connection cover plate on the back of the monitor.

  • Insert the specialized locking USB-C connector into the Type-C power input, ensuring it clicks firmly into place, and then reinstall the cover plate tightly.

  • Connect the local RJ45 network cable into the monitor's dedicated NIC port.

5. Initial Power On

  • Connect the main AC power cord from the 180W adapter brick to your live facility power outlet.

  • Locate the physical Power Button on the right-rear side of the monitor frame (just above the power control light) and toggle it to boot the unit.

  • Verify that the system status indicator light transitions to a solid green color within approximately 2 seconds, signaling a successful hardware initialization.

Last updated: